# How Daystamp decides a status

Every answer names its basis. In order of strength:

1. **snapshot**: the listing was (or was not) in our capture of EPA's list on that day. Captures run daily from 2026-11-09. If a listing changed between two captures and the day falls between them, the answer is unknown.
2. **disqualified_list**: EPA's Disqualified Products List dates the model's disqualification on or before that day, unless a later certification of the same model number is on file.
3. **epa_date_certified**: before our first capture, a listing that was present at our first capture is certified from EPA's date certified onward.
4. **epa_archived_list**: a model on EPA's archived list for the previous specification is certified from its date certified until that specification ended. After it ended the answer is not_certified (spec_superseded).
5. **certified_date_after**: EPA's date certified on the listing is after that day. This answers unknown, never not_certified: EPA re-stamps date certified when a listing is updated (in the current data, 140,463 of 284,449 heat pump combinations carry a date certified more than a year after their date available on market), so a later date does not show the model was uncertified before it.

Statuses: certified, not_certified, disqualified, not_found (inside our capture window, no listing matches the model number: check the spelling), unknown (no public EPA source answers it), ambiguous (several brands share the model number and disagree; pass brand).

Model numbers: case, spaces, dashes, slashes and dots are ignored. EPA lists model families with * or # standing for one character or none, so CDH2445*** matches CDH2445PS. A match through a wildcard is labelled.

What Daystamp cannot know: listings EPA dropped before our first capture and that are on no archived list or disqualification. EPA publishes no delisting dates. Daystamp states EPA facts; whether a claim qualifies for a rebate depends on each programme's own rules.
