# EV chargers (AC): certification history and reach

> Was a EV charger certified on a past date? 482 listings from 159 brands, certified answers back to 17 Jul 2018, captured daily.

Canonical: https://daystamp.bulkhead.solutions/categories/ev-chargers

Observed daily from 9 November 2026. Before that, certified answers reach back to 17 July 2018; a date before a listing's own date certified answers unknown. EPA publishes no archived list for the previous specification.

- Listings on 2026-11-09: 482
- Brands: 159
- Specification: Certified models meet all ENERGY STAR requirements for AC-output models as listed in the Version 1.0 ENERGY STAR Program Requirements for Electric Vehicle Supply Equipment that are effective as of December 27, 2016, the Version 1.1 requirements effective as of March 31, 2021, or the Version 1.2 requirements effective as of June 20, 2023.
- Re-stamped dates: 0 of 482
- Wildcard listings: 93
- Archived lists: none
- EPA dataset: ENERGY STAR Certified Electric Vehicle Supply Equipment - AC-Output, https://data.energystar.gov/d/5jwe-c8xm

## Brands

| Brand | Listings | Earliest date certified | Latest |
| --- | --- | --- | --- |
| [AUTEL](https://daystamp.bulkhead.solutions/categories/ev-chargers/autel) | 37 | 2022-06-17 | 2026-10-28 |
| [HBE](https://daystamp.bulkhead.solutions/categories/ev-chargers/hbe) | 21 | 2023-08-29 | 2025-01-07 |
| [SOARING SUNSHINE](https://daystamp.bulkhead.solutions/categories/ev-chargers/soaring-sunshine) | 16 | 2025-03-24 | 2025-03-24 |
| [Lectron](https://daystamp.bulkhead.solutions/categories/ev-chargers/lectron) | 15 | 2023-09-14 | 2026-09-07 |
| [Leviton](https://daystamp.bulkhead.solutions/categories/ev-chargers/leviton) | 14 | 2022-10-24 | 2026-09-22 |
| [LITE-ON Technology Corporation](https://daystamp.bulkhead.solutions/categories/ev-chargers/lite-on-technology-corporation) | 11 | 2021-12-03 | 2026-07-09 |
| [Joint](https://daystamp.bulkhead.solutions/categories/ev-chargers/joint) | 10 | 2022-04-19 | 2025-10-14 |
| [BTCPower](https://daystamp.bulkhead.solutions/categories/ev-chargers/btcpower) | 8 | 2020-03-24 | 2024-06-26 |
| [Grizzl-E](https://daystamp.bulkhead.solutions/categories/ev-chargers/grizzl-e) | 8 | 2024-08-06 | 2026-06-30 |
| [(ABB)](https://daystamp.bulkhead.solutions/categories/ev-chargers/abb) | 7 | 2021-07-06 | 2022-07-18 |
| [ChargePoint](https://daystamp.bulkhead.solutions/categories/ev-chargers/chargepoint) | 7 | 2023-03-01 | 2025-06-20 |
| [Lite-On](https://daystamp.bulkhead.solutions/categories/ev-chargers/lite-on) | 7 | 2021-06-11 | 2026-06-15 |
| [Longhorn](https://daystamp.bulkhead.solutions/categories/ev-chargers/longhorn) | 7 | 2023-05-19 | 2025-11-11 |
| [MES](https://daystamp.bulkhead.solutions/categories/ev-chargers/mes) | 7 | 2024-09-05 | 2025-11-11 |
| [RAB](https://daystamp.bulkhead.solutions/categories/ev-chargers/rab) | 7 | 2023-11-02 | 2025-01-07 |
| [SemaConnect](https://daystamp.bulkhead.solutions/categories/ev-chargers/semaconnect) | 7 | 2019-01-22 | 2022-11-03 |
| [Blink](https://daystamp.bulkhead.solutions/categories/ev-chargers/blink) | 6 | 2018-07-17 | 2022-06-06 |
| [EvoCharge](https://daystamp.bulkhead.solutions/categories/ev-chargers/evocharge) | 6 | 2020-11-16 | 2024-11-27 |
| [FLO](https://daystamp.bulkhead.solutions/categories/ev-chargers/flo) | 6 | 2019-12-10 | 2024-06-24 |
| [PointGuard](https://daystamp.bulkhead.solutions/categories/ev-chargers/pointguard) | 6 | 2024-06-12 | 2024-06-13 |
| [REALSEE](https://daystamp.bulkhead.solutions/categories/ev-chargers/realsee) | 6 | 2026-07-07 | 2026-07-07 |
| [TOPBAND](https://daystamp.bulkhead.solutions/categories/ev-chargers/topband) | 6 | 2024-03-22 | 2024-12-03 |
| [Espen](https://daystamp.bulkhead.solutions/categories/ev-chargers/espen) | 5 | 2022-04-19 | 2025-01-14 |
| [EVIQO](https://daystamp.bulkhead.solutions/categories/ev-chargers/eviqo) | 5 | 2023-09-12 | 2025-03-03 |
| [Injet](https://daystamp.bulkhead.solutions/categories/ev-chargers/injet) | 5 | 2023-12-27 | 2026-05-26 |
| [LEDVANCE](https://daystamp.bulkhead.solutions/categories/ev-chargers/ledvance) | 5 | 2023-05-31 | 2025-07-02 |
| [LINKPOWER](https://daystamp.bulkhead.solutions/categories/ev-chargers/linkpower) | 5 | 2026-03-02 | 2026-03-02 |
| [Siemens](https://daystamp.bulkhead.solutions/categories/ev-chargers/siemens) | 5 | 2024-05-31 | 2024-07-23 |
| [Zerova](https://daystamp.bulkhead.solutions/categories/ev-chargers/zerova) | 5 | 2023-03-17 | 2025-09-03 |
| Auxus | 4 | 2024-04-24 | 2025-08-25 |
| Blink Network, LLC | 4 | 2023-10-18 | 2025-03-24 |
| CHARGECORE | 4 | 2023-05-18 | 2024-07-23 |
| Delta | 4 | 2024-02-07 | 2026-09-23 |
| FractalEV | 4 | 2024-04-24 | 2025-10-25 |
| ICAPIA | 4 | 2024-05-23 | 2025-01-08 |
| Legrand | 4 | 2022-10-24 | 2025-10-14 |
| Sinexcel | 4 | 2023-09-26 | 2024-01-29 |
| (ApexCharger) | 3 | 2024-09-08 | 2025-07-22 |
| breezEV | 3 | 2022-04-19 | 2023-10-10 |
| CHARGETRONIX | 3 | 2023-05-19 | 2024-11-11 |
| DeWalt | 3 | 2024-04-29 | 2025-10-10 |
| EATON | 3 | 2023-02-13 | 2024-03-12 |
| EN+ | 3 | 2022-12-01 | 2024-11-08 |
| Enphase | 3 | 2023-03-17 | 2024-05-31 |
| EV charging | 3 | 2024-07-05 | 2024-07-05 |
| HFT | 3 | 2023-10-19 | 2023-10-19 |
| Loop Global Inc | 3 | 2020-05-03 | 2022-10-31 |
| Rivian | 3 | 2022-03-30 | 2025-05-23 |
| Sarin Energy Solutions | 3 | 2023-08-31 | 2023-11-09 |
| Schneider Electric | 3 | 2025-03-28 | 2026-01-08 |
| Star Charge | 3 | 2024-07-22 | 2026-08-13 |
| WALLBOX | 3 | 2023-10-03 | 2024-03-04 |
| Watti | 3 | 2024-11-12 | 2025-01-14 |
| WPT | 3 | 2022-06-22 | 2022-06-23 |
| (LENZ) | 2 | 2023-06-14 | 2025-03-26 |
| (RUNCHENGDA) | 2 | 2023-05-11 | 2023-05-11 |
| AIXINE | 2 | 2026-09-02 | 2026-09-02 |
| Chargie | 2 | 2024-08-27 | 2024-08-27 |
| CYBER SWITCHING | 2 | 2025-01-14 | 2025-10-14 |
| Deltran Battery Tender, , | 2 | 2024-01-04 | 2024-01-04 |
| DynaChrg | 2 | 2025-06-18 | 2025-11-14 |
| ECOFLOW | 2 | 2025-06-06 | 2025-07-23 |
| Electric Avenue Manufacturing | 2 | 2023-12-12 | 2025-03-28 |
| Electron Charger | 2 | 2022-04-19 | 2026-06-12 |
| EVBOLT, Inc. | 2 | 2023-11-09 | 2024-03-19 |
| GM | 2 | 2023-12-19 | 2023-12-19 |
| GONEO | 2 | 2024-09-11 | 2024-09-11 |
| Greenworks tools | 2 | 2024-05-06 | 2024-05-06 |
| InCharge | 2 | 2024-10-18 | 2024-10-23 |
| INTEGRA ENERGY | 2 | 2023-06-23 | 2023-06-23 |
| Iocharger | 2 | 2024-02-02 | 2025-03-11 |
| KWEV | 2 | 2024-02-05 | 2024-02-05 |
| Lite-On Technology Corp | 2 | 2020-11-18 | 2023-09-06 |
| LONGSUN | 2 | 2024-02-20 | 2024-02-20 |
| MSI | 2 | 2024-05-27 | 2025-12-17 |
| MUSTART | 2 | 2024-06-17 | 2024-07-24 |
| OpConnect | 2 | 2022-11-15 | 2026-04-29 |
| Pando Electric | 2 | 2025-01-21 | 2026-01-05 |
| PIONPOWER | 2 | 2026-07-28 | 2026-07-28 |
| PowerPump | 2 | 2022-11-04 | 2026-04-20 |
| RENOVA | 2 | 2025-11-22 | 2025-11-22 |
| RIPPLEON | 2 | 2025-03-10 | 2026-01-19 |
| Tcharge | 2 | 2024-02-01 | 2024-02-01 |
| Tellus Power | 2 | 2026-08-07 | 2026-08-14 |
| Tesla | 2 | 2023-09-18 | 2024-03-26 |
| Ubiquiti Inc. | 2 | 2024-08-26 | 2024-08-29 |
| WOLFBOX | 2 | 2024-04-19 | 2024-04-19 |
| Zopoise, | 2 | 2023-11-03 | 2023-11-03 |
| AA | 1 | 2024-07-17 | 2024-07-17 |
| ASJade Technology Inc | 1 | 2024-08-14 | 2024-08-14 |
| BMW | 1 | 2025-09-17 | 2025-09-17 |
| CHARGETROINX | 1 | 2024-11-11 | 2024-11-11 |
| Control Module Inc. | 1 | 2024-05-07 | 2024-05-07 |
| DANLAW | 1 | 2025-01-30 | 2025-01-30 |
| Dunamis | 1 | 2024-11-26 | 2024-11-26 |
| ELECTRIFY CANADA LP | 1 | 2021-06-29 | 2021-06-29 |
| Elinta Charge, UAB | 1 | 2025-04-11 | 2025-04-11 |
| Elite | 1 | 2025-03-05 | 2025-03-05 |
| Emporia | 1 | 2022-05-31 | 2022-05-31 |
| Enerouter | 1 | 2025-05-02 | 2025-05-02 |
| Enphase Energy | 1 | 2026-03-02 | 2026-03-02 |
| EpicCharging | 1 | 2022-04-19 | 2022-04-19 |
| eTreego Co.,LTD | 1 | 2024-12-13 | 2024-12-13 |
| EVAR Corp | 1 | 2024-08-08 | 2024-08-08 |
| EVBOLT | 1 | 2022-05-23 | 2022-05-23 |
| EverCharge Inc. | 1 | 2020-10-24 | 2020-10-24 |
| EVFastCharge / MOTEN EVFC | 1 | 2023-05-30 | 2023-05-30 |
| Evmode | 1 | 2024-05-01 | 2024-05-01 |
| FoMoCo | 1 | 2023-01-12 | 2023-01-12 |
| Free2Move Charge | 1 | 2025-08-11 | 2025-08-11 |
| G9EV | 1 | 2024-08-07 | 2024-08-07 |
| Gocean | 1 | 2025-12-10 | 2025-12-10 |
| GoPowerEV | 1 | 2023-11-15 | 2023-11-15 |
| HBE ENERGY | 1 | 2026-07-31 | 2026-07-31 |
| HONDA | 1 | 2025-03-27 | 2025-03-27 |
| Hubbell | 1 | 2025-09-10 | 2025-09-10 |
| InCharge Energy | 1 | 2024-01-05 | 2024-01-05 |
| IoTecha | 1 | 2024-01-22 | 2024-01-22 |
| It's Electric | 1 | 2024-06-04 | 2024-06-04 |
| IYILO | 1 | 2025-09-23 | 2025-09-23 |
| JASBON | 1 | 2026-07-31 | 2026-07-31 |
| KHONS | 1 | 2026-05-08 | 2026-05-08 |
| MAX GREEN | 1 | 2026-04-14 | 2026-04-14 |
| MAZDA | 1 | 2025-09-10 | 2025-09-10 |
| MIDA, | 1 | 2023-02-22 | 2023-02-22 |
| NECS | 1 | 2026-01-19 | 2026-01-19 |
| noodoe | 1 | 2022-05-03 | 2022-05-03 |
| NUVVE POWERPORT | 1 | 2020-01-08 | 2020-01-08 |
| OpConnect Inc | 1 | 2024-04-11 | 2024-04-11 |
| Orange Charger | 1 | 2025-09-17 | 2025-09-17 |
| Parasol Elite Power | 1 | 2023-10-31 | 2023-10-31 |
| PHIHONG | 1 | 2021-12-06 | 2021-12-06 |
| PortFi | 1 | 2024-02-05 | 2024-02-05 |
| PURPL | 1 | 2022-02-16 | 2022-02-16 |
| PYS | 1 | 2025-03-26 | 2025-03-26 |
| PYS High-Tech Co., Ltd. | 1 | 2026-07-20 | 2026-07-20 |
| Qcharge | 1 | 2025-06-16 | 2025-06-16 |
| Revvit | 1 | 2025-02-10 | 2025-02-10 |
| Schumacher | 1 | 2025-04-01 | 2025-04-01 |
| Solar Edge | 1 | 2020-06-25 | 2020-06-25 |
| SolaX Power | 1 | 2025-02-26 | 2025-02-26 |
| SP·NICE, | 1 | 2023-02-22 | 2023-02-22 |
| SPAN IO | 1 | 2023-01-03 | 2023-01-03 |
| sunpoint | 1 | 2023-10-31 | 2023-10-31 |
| SWTCH | 1 | 2026-08-04 | 2026-08-04 |
| Topcharge | 1 | 2023-02-22 | 2023-02-22 |
| Turnongreen | 1 | 2022-03-17 | 2022-03-17 |
| TYPES | 1 | 2024-07-24 | 2024-07-24 |
| Universal Wall Connector | 1 | 2023-09-18 | 2023-09-18 |
| WAIZIDA | 1 | 2024-11-22 | 2024-11-22 |
| Webasto | 1 | 2023-12-05 | 2023-12-05 |
| Webasto Charging Systems Inc | 1 | 2023-10-31 | 2023-10-31 |
| WEEYU | 1 | 2022-11-18 | 2022-11-18 |
| Westgate | 1 | 2025-01-07 | 2025-01-07 |
| Xeal Energy | 1 | 2023-11-02 | 2023-11-02 |
| XLynk | 1 | 2025-11-12 | 2025-11-12 |
| Yiwei | 1 | 2025-01-06 | 2025-01-06 |
| Zemetric Inc | 1 | 2024-01-05 | 2024-01-05 |
| ZHEN JIA | 1 | 2025-03-11 | 2025-03-11 |

---

Automated and unreviewed. Daystamp reads EPA's public lists automatically and no person checks each answer. Data can be incomplete, late or wrong. Always verify against the EPA source linked with every answer before you act. Not legal, tax or financial advice. A status is a fact about EPA's list on a date, not a rebate decision: whether a purchase qualifies depends on each programme's own rules, and EPA's own published records prevail.

ENERGY STAR® is a registered mark of the U.S. Environmental Protection Agency. Daystamp is independent and is not affiliated with or endorsed by EPA. Data: U.S. EPA ENERGY STAR program, data.energystar.gov and energystar.gov, public domain under the EPA Standard Open Data License.
